Markets

U.S. open in 53 hrs, 17 mins
10,309.92
-154.48
 
1.48%
2,138.44
-37.61
 
1.73%
1,091.49
-19.14
 
1.72%
101.406
0.5625
 
0.56%
5,245.73
51.60
 
0.99%
9,081.52
-301.72
 
3.22%
21,134.50
-1,075.91
 
4.84%
-0.0023
 
0.15%
-0.86
 
1.00%
1,177.80
-9.20
 
0.78%
75.97
-1.99
 
2.55%
Get Free Stock Chart for:

Paladin Energy Ltd: Heinrich Uranium Project, Namibia

Marketwire
posted: 87 DAYS 20 HOURS AGO

- Pre mining pit definition drilling (Details 1 and 2)


PERTH, WESTERN AUSTRALIA -- (Marketwire) -- 09/01/09 -- Paladin Energy Ltd ("Paladin" or "the Company") (TSX: PDN)(ASX: PDN) is pleased to announce exploration drilling results from its infill and resource definition programme at the Langer Heinrich Mine in Namibia.

Recent exploration drilling in the area of Detail 4 in the far west of Mining Lease ML140 has intersected significant thicknesses and grades of mineralisation confirming the value of this area. Previous wide spaced drilling in this area by Gencor in the early 1980's had only intersected limited mineralisation. To date there have been 270 holes drilled for a total of 6,080m within Details 4 and Detail 6, immediately to the west of Detail 4. Intersections of 8m @ 967ppm eU3O8, 7m @ 1,527ppm eU3O8 and 8m @ 832ppm eU3O8 have been recorded and are shown on the plan below. It is expected that drilling results from this area will be incorporated into an updated Mineral Resource to be completed late in the December 2009 Quarter.

To view the map associated with this release, please visit the following link: http://media3.marketwire.com/docs/Figure1PDN.jpg

Infill drilling ahead of mining in the areas of Detail 1 and Detail 2 has also returned appreciable thicknesses and grades of mineralisation. This information is used to better define the limits of the current pit design to capture additional ore and limit the volumes of waste removed. In the area of Detail 2 this is particularly important as it will allow for the most efficient conversion of the pit voids to tailings storage.


----------------------------------------------------------------------------
Detail 2 Drilling                           Detail 1 Drilling
----------------------------------------------------------------------------
Hole         Intersection      Grade ppm    Hole    Intersection  Grade ppm
                                   eU3O8                              eU3O8
----------------------------------------------------------------------------
GC13191                17            646    GC10027           11       1356
----------------------------------------------------------------------------
GC13214                 7            872    GC10198           16       1191
----------------------------------------------------------------------------
GC13244                 5           1295    GC10200           13        917
----------------------------------------------------------------------------
GC17055                 7           1163    GC10284           18        696
----------------------------------------------------------------------------
GC17093                11            846
----------------------------------------------------------------------------

All intersections detailed were calculated at a cut off grade of 100ppm U3O8 and a maximum included waste of 1m. Locations of the drilling areas are shown on the plan above.

Declaration

The information in this announcement that relates to Exploration and Mineral Resources is based on information compiled by David Princep B.Sc. Mr Princep is a member of the AusIMM. and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as Competent Persons as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and as a Qualified Person as defined in Canadian National Instrument 43-101. Mr Princep is a full-time employee of Paladin Energy Ltd and consents to the inclusion of the information in this announcement in the form and context in which it appears.

A.C.N. 061 681 098

Contacts:
Paladin Energy Ltd
John Borshoff
Managing Director/CEO
+61-8-9381-4366
john.borshoff@paladinenergy.com.au

Paladin Energy Ltd
Greg Taylor
Investor Relations Contact
905 337-7673 or Mob: 416 605-5120 (Toronto)
greg.taylor@paladinenergy.com.au

Bookmark:

Headlines From AOL Money & Finance Partners

CNBC
The Big Money
Smart Money
Kiplinger.com
The street

Visit Money & Finance for stock quotes, the web's best online portfolio manager and the latest business & financial news. Find out about every aspect of personal finance and money management, from finding the best mortgage rates and preventing identity theft to making money, saving money and investing money.